Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)

Description

Berkeley Labs "Utility-Scale Solar", 2022 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2021, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.

Resources

Name Format Description Link
53 Workbook summarizing all data used in the briefing and its graphs, as well as additional data assets (e.g. solar project costs by state, cost statistics in $/W-DC, etc.) https://data.openei.org/files/5796/2022_utility-scale_solar_data_update.xlsm
53 Annual (2012-2021) energy and capacity value (both expressed in $2021/MWh) by EIA plant ID for the seven organized markets and ten additional balancing areas (AZPS, CPLE, DUK, FPL, NEVP, PACE, PNM, PSCO, SOCO, TVA) https://data.openei.org/files/5796/UPV%20Value%20visualization%20through%202021.xlsx
21 The project page includes a technical brief, a power point presentation, webinar recordings and interactive data visualizations. https://emp.lbl.gov/utility-scale-solar/
57 Hourly plant-level generation estimates (2012-2021) based on plant-specific technical parameters and historical irradiance records from the National Solar Radiation Database (NSRDB), (2012-2020) and The High-Resolution Rapid Refresh (HRRR), (2021). The numbers in the file names represent EIA plant IDs. gen_SAM represents the simple output of NREL's Solar Advisory Model, gen_debias_output incorporates official plant-level monthly or annual generation records (EIA 928) and ISO solar profiles. gen_clean is our best post-curtailment generation estimate, gen_curtailed represents hourly curtailments for plants in CAISO and ERCOT. https://data.openei.org/files/5796/final%20gen%20data.zip

Tags

  • market-value
  • ppa
  • capital
  • capital-costs
  • data
  • price
  • operating-cost
  • pv
  • operating-costs
  • photovoltaic
  • wholesale-market-value
  • solar
  • power-purchase-agreement
  • analysis
  • capacity
  • ground-mounted
  • lcoe
  • capacity-factor
  • market
  • csp
  • plant-level
  • interconnection-queue
  • power
  • utility-scale-solar
  • hourly
  • costs
  • power-purchase-agreeents
  • deployment
  • pv-battery
  • cpsp
  • technology
  • energy-analysis
  • solar-power
  • berkeley-lab
  • battery
  • 2022
  • capacity-factors
  • generation
  • energy

Topics

Categories