Utah FORGE: Video of Utah FORGE Drilling Planning for Production Well 16B(78)-32

Description

This is a YouTube video containing the specifics of well planning for Utah FORGE 16B(78)-32. This well will be drilled as a doublet approximately 300 feet parallel to and above 16A(78)-32 and will be drilled between approximately April 15th and July 17th 2023.

Resources

Name Format Description Link
Drilling Well on Paper - Drilling Program Well 16B78-32.pdf PDF Slide deck which was presented in video recording. Open resource
Well Planning Video HTML This video discusses topics such as: seismic mitigation; improving well quality; operational and scientific objectives; well design; instrument cable protection; stress measurements; the coring program; drilling site geology; well logging; well stimulation and fracture intersections; borehole cooling; and instrument installation. Open resource

Tags

Topics

Categories