Utah FORGE: Video of Utah FORGE Drilling Planning for Production Well 16B(78)-32

Description

This is a YouTube video containing the specifics of well planning for Utah FORGE 16B(78)-32. This well will be drilled as a doublet approximately 300 feet parallel to and above 16A(78)-32 and will be drilled between approximately April 15th and July 17th 2023.

Resources

Name Format Description Link
21 This video discusses topics such as: seismic mitigation; improving well quality; operational and scientific objectives; well design; instrument cable protection; stress measurements; the coring program; drilling site geology; well logging; well stimulation and fracture intersections; borehole cooling; and instrument installation. https://www.youtube.com/watch?v=1VsO-Qu3NJk
33 Slide deck which was presented in video recording. https://gdr.openei.org/files/1481/DWOP%20March%202.pdf

Tags

  • processed-data
  • fiber-optic
  • egs
  • well-planning
  • well-planning-video
  • vibrations
  • utah-forge
  • injection-testing
  • doublet-pair
  • well-16b78-32
  • drilling
  • stress-measurement
  • circulation-testing
  • geothermal
  • energy

Topics

Categories