Description
Preliminary monitoring and analyses for the Utah FORGE Milford Site.
Includes a report detailing the seismic monitoring goals and results, a detailed techno-economic infrastructure assessment with an analysis, a budget, schedules, and cost summaries, and a summary of environmental impacts.
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| Preliminary Seismic Monitoring.pdf | A PDF format report by Kristine Pankow, Ph.D., University of Utah Seismic Stations, detailing the seismic monitoring goals and results for Utah FORGE Phase 2A. | Open resource | |
| NEPA Summary of Environmental Impacts.pdf | NEPA, Summary of environmental impacts for the Utah FORGE site. | Open resource | |
| Techno-Economic Infrastructure Assessment.pdf | Detailed techno-economic infrastructure assessment; analysis, budget, schedules, and cost summaries for the Utah FORGE project. Report by Kristine Pankow, Ph.D., University of Utah Seismic Stations | Open resource |
Tags
- assessment
- budget
- cost
- ea
- economic
- environment
- environmental-impacts
- evironmental
- forge
- geophysics
- geothermal
- infrastructure
- milford
- monitoring
- nepa
- report
- roosevelt-hot-springs
- schedule
- schedules
- seismic
- seismicity
- seismic-monitoring
- technical
- techno-economic
- techno-economic-infrastructure
- utah
- utah-forge
- utah-geothermal