Description
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| 77 | The presentation followed a peer review format comprised of two parts: a formal presentation roughly lasting 20 minutes followed by a Q&A discussion lasting about 25 minutes. | https://gdr.openei.org/files/1534/Utah%20FORGE%201-2551-CSM%20%202023%20Annual%20Workshop%20Presentation.mp4 | |
| 33 | This is a PDF of the presentation slides featured in the associated workshop presentation recording. | https://gdr.openei.org/files/1534/1-2551-CSM-Fleckenstein%202023%20Annual%20Workshop%20Presentation%20Slides.pdf | |
| 33 | This is a project report compiled with the presentation for the workshop. The document outlines various project aspects, such as objectives, technical barriers and targets, approach, timeline, accomplishments, challenges, and future plans. | https://gdr.openei.org/files/1534/1-2551-CSM-Fleckenstein%202023%20Annual%20Workshop%20Report.pdf |
Tags
- multi-stage-fracturing-system
- report
- multistage-fracture-stimulation
- annual-workshop
- egs
- well-tractor
- heat-carrier-fluid
- utah-forge
- flow-control
- injection
- zonal-isolation
- stimulation
- stimulation-technology
- 2023
- horizontal-wellbore
- long-reach-injector
- geothermal
- energy