US Potable Water Reuse System Costs

Description

This submission contains a set of U.S.-specific potable reuse capital and operations and maintenance (O&M) cost data ($2020) found in published presentations and reports from engineering consulting firms, utility and water agency press releases or websites, and literature. For any unbuilt facilities, the reported costs found in technical documents are mostly engineer estimates and may be subject to change as construction proceeds. This data set contains a mix of both facility specific and total capital costs, which include conveyance infrastructure. Note that this dataset does not include detailed cost breakdowns for each of the facilities. This submission also contains the sources used to build this dataset in pdf format.

Resources

Name Format Description Link
Potable Reuse Cost Sources.zip ZIP Cost sources (reports, presentations, presentations, literature, etc) in pdf format. Citations included in zipped file. Open resource
Select Potable Reuse Costs.xlsx XLS Facility-specific capital and O&M costs ($2020) for a select number of potable reuse systems in the U.S. Total capital costs are included, if available. Open resource

Tags

Topics

Categories