Description
Maintenance and renovation of the Espartel (ES) mooring line and collection of the line deployed in August 2020 in Camarinal Sur (CS). • Performing CTD-O2-LADCP profiles. • Continuous sampling of temperature, salinity, surface fluorescence and currents. • Analysis with ACSM staff of the Lander benthic anchoring options
Resources
| Name | Format | Description | Link |
|---|