University of Illinois Campus Deep Direct-Use Feasibility Study - Designs for Deep Injection and Monitoring Wells

Description

The following information is provided about the design of deeps wells constructed in the Illinois Basin to store, sequester, or dispose of CO2, natural gas, and industrial wastes.

Resources

Name Format Description Link
21 Several brine extraction and treatment scenarios were tested, simulated, and analyzed for their effectiveness in extracting brine from deep geologic formations. Both vertical and horizontal wells designs were studied. https://www.osti.gov/biblio/1363792
21 The detailed plans for three deep wells drilled at Decatur, Illinois for the Illinois Basin – Decatur Project (IBDP) are provided. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. https://www.osti.gov/biblio/1222708
21 A major focus of this assessment was to investigative the geological, technical, and environmental feasibility of deep well injection, the adequacy of current regulations and regulatory practices. The design plans for constructing wells at seven injection facilities was included in the report. https://www.ideals.illinois.edu/items/44924

Tags

  • deep-direct-use
  • illinois-basin
  • industrial-waste-disposal
  • well-construction
  • injection
  • ddu
  • geothermal
  • injection-wells
  • energy
  • university-of-illinois