| Name |
Format |
Description |
Link |
|
33 |
1:30 scale Triton model tank test plan drawings. Final project deliverable D6 for DE-FOA-0001310. |
https://mhkdr.openei.org/files/303/D6_Tank_Test_Plan_Drawings.pdf |
|
33 |
1:30 scale Triton model tank test plan. Final project deliverable D6 for DE-FOA-0001310. |
https://mhkdr.openei.org/files/303/D6_Tank_Test_Plan.pdf |
|
53 |
Updated risk analysis identifying risks, causes of risks, occurrence, and severity. A risk priority number (RPN) is computed for each risk. Final project deliverable D7 for DE-FOA-0001310. |
https://mhkdr.openei.org/files/303/D7_Updated_Risk_Register.xlsx |
|
33 |
Numerical analysis of survival configuration and extreme design loads. Final project deliverable D5 for DE-FOA-0001310. |
https://mhkdr.openei.org/files/303/D5_Numerical_Survivability_Report.pdf |
|
53 |
1:30 scale Triton model tank test plan wave data. Final project deliverable D6 for DE-FOA-0001310. |
https://mhkdr.openei.org/files/303/D6_Tank_Test_Plan_Waves.xlsx |
|
33 |
Survival configuration down-selection. Final project deliverable D4 for DE-FOA-0001310. |
https://mhkdr.openei.org/files/303/D4_Down-Selection_Report.pdf |
|
53 |
1:30 scale Triton model tank test plan instrumentation list. Final project deliverable D6 for DE-FOA-0001310. |
https://mhkdr.openei.org/files/303/D6_Tank_Test_Plan_Instrumentation_List.xlsx |
|
33 |
Design drawings for baseline design and nonselected survival approaches. Final project deliverable D8 for DE-FOA-0001310. |
https://mhkdr.openei.org/files/303/D8_Design_Drawings_Baseline_NonselectedApproaches.pdf |
|
33 |
Design drawings for Final system including Advanced survival configuration. Final project deliverable D8 for DE-FOA-0001310. |
https://mhkdr.openei.org/files/303/D8_Design_Drawings_Final_Design.pdf |
|
33 |
1:30 scale Triton model tank test report. Final project deliverable D9 for DE-FOA-0001310. |
https://mhkdr.openei.org/files/303/D9_Tank_Test_Report.pdf |
|
53 |
Final project risk analysis identifying risks, causes of risks, occurrence, and severity. A risk priority number (RPN) is computed for each risk. Final project deliverable D14 for DE-FOA-0001310. |
https://mhkdr.openei.org/files/303/D14_Final_Risk_Register.xlsx |