Strategic Measure_Austin Energy average annual system rate

Description

This data set shows Austin Energy's current system rate, and the 2% affordability limit set by the Austin City Council. The difference between the current system rate and the 2% affordability limit is shown as both a dollar figure and a percentage. Note- the current system rate is based on budgeted system rates and is effective at the beginning of each fiscal year. This dataset supports measure EOA.C.5.a of SD23 Data Source: Austin Energy Calculations: Dollar Amount- The 2% Affordability Limit is subtracted from the Current System Rate. Percentage- The Current System Rate is divided by the 2% Affordability Limit, subtracted from 1, and then multiplied by 100. View more details and insights related to this measure on the story page: https://data.austintexas.gov/stories/s/t4es-hvsj

Resources

Name Format Description Link
8 https://data.austintexas.gov/api/views/eatd-irgz/rows.csv?accessType=DOWNLOAD
40 https://data.austintexas.gov/api/views/eatd-irgz/rows.rdf?accessType=DOWNLOAD
23 https://data.austintexas.gov/api/views/eatd-irgz/rows.json?accessType=DOWNLOAD
55 https://data.austintexas.gov/api/views/eatd-irgz/rows.xml?accessType=DOWNLOAD

Tags

  • sd23
  • austin-energy
  • utility-rates
  • electric-utility

Topics

  • Local Government

Categories