StingRAY Updated WEC Risk Registers

Description

Updated Risk Registers for major subsystems of the StingRAY WEC completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL.

Resources

Name Format Description Link
53 Hull Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL. https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0400%20SCADA%20PD%20v3.6%2006-27-2018%20%281%29.xlsx
53 Electric Plant Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL. https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0300%20Electric%20Plant%20PD%20v3.6%2006-27-2018%20%281%29.xlsx
53 Safety Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL. https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0520%20Safety%20PD%20v3.7%2006-27-2018%20%281%29.xlsx
53 Ballast Control Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL. https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0510%20Ballast%20Control%20PD%20v3.6%2006-27-2018%20%281%29.xlsx
53 PTO Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL. https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0200%20PTO%20PD%20v4.0%2006-27-2018%20%281%29.xlsx
53 Outfit & Furnishings Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL. https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0600%20Outfit%20and%20Furnishings%20PD%20v3.0%2006-27-2018%20%281%29.xlsx
53 Surveillance Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL. https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0580%20Surveillance%20PD%20v3.0%2006-27-2018%20%281%29.xlsx
53 Station Power Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL. https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0540%20Station%20Power%20PD%20v3.6%2006-27-2018%20%281%29.xlsx
53 Mooring Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL. https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0700%20Mooring%20PD%20v3.7%2006-27-2018%20%281%29.xlsx
53 Electrical Collection Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL. https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0800%20Electrical%20Collection%20PD%20v3.7%2006-27-2018%20%281%29.xlsx
53 Cooling System Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL. https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0560%20Cooling%20System%20PD%20v3.6%2006-27-2018%20%281%29.xlsx
53 Bilge Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL. https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0570%20Bilge%20PD%20v3.6%2006-27-2018%20%281%29.xlsx
53 Hull Penetrations Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL. https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0630%20Hull%20Penetrations%20PD%20v3.6%2006-27-2018%20%281%29.xlsx
53 Operations Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL. https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-1100%20Operations%20PD%20v3.6%2006-27-2018%20%281%29.xlsx
21 Document developed by NREL detailing the Marine and Hydrokinetic Technology Development Risk Management Framework. https://mhkdr.openei.org/submissions/192
53 Hull Fitting Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL. https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0620%20Hull%20Fitting%20PD%20v3.6%2006-27-2018%20%281%29.xlsx
53 Climate Control Risk Register completed according to the methodology described in [DE-EE0007347 M3.4 SR-FMECA-1000 v4.0 PD 03-06-2017.pdf], in compliance with the DOE Risk Management Framework developed by NREL. https://mhkdr.openei.org/files/283/DE-EE0007347%20T14.4%20SR-RR-0530%20Climate%20Control%20PD%20v3.6%2006-27-2018%20%281%29.xlsx

Tags

  • wave-energy
  • electric-plant
  • risk-register
  • maintenance
  • converter
  • magnet-generator
  • hydrokinetic
  • electrical-collection
  • outfit
  • station-power
  • surveillance
  • mhk
  • point
  • wave
  • pto
  • power-take-off
  • module
  • system
  • operations
  • hull
  • mooring
  • single-point-mooring
  • safety
  • wec
  • cooling
  • ballast
  • fmeca
  • direct-drive
  • marine
  • climate
  • bilge
  • cost-reduction
  • point-absorber-buoy
  • power
  • furnishing
  • columbia-power-technologies
  • risk-management
  • installation
  • stingray
  • absorber
  • technology
  • operation
  • control
  • penetrations
  • fitting
  • attenuator
  • energy

Topics

Categories