September 2011 Most Probable 24-Month Study

Description

The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor Park, Blue Mesa, Morrow Point, Crystal, Vallecito, Navajo, Powell, Hoover Dam - Lake Mead, Davis Dam - Lake Mohave, and Parker Dam - Lake Havasu. Operations were projected using Reclamation’s 24-Month Study RiverWare model with the Most Probable unregulated inflow projections provided by the National Weather Service’s Colorado Basin River Forecast Center. The Most Probable inflow scenario reflects a median hydrologic condition which statistically would be exceeded 50% of the time. The operations depicted in this report reflects the Annual Operating Plan as approved by the Secretary of the Interior.

Resources

Name Format Description Link
RISE Item Details Page URL for "September 2011 Most Probable 24-Month Study" HTML Landing page for "September 2011 Most Probable 24-Month Study" Open resource
PDF File for "September 2011 Most Probable 24-Month Study" PDF "September 2011 Most Probable 24-Month Study" as a PDF file Open resource

Tags

Topics

Categories