ROSETTA-ORBITER CHECK RPCMAG 3 CVP CALIBRATED V3.0
Description
This dataset contains CALIBRATED DATA of all three commissioning
phases CVP1,CVP2,CVP3 and also data of the interference campaign. All
these phases together are labeled as Commissioning Phase CVP.
(Version 3.0 is the first version archived.)
Resources
| Name |
Format |
Description |
Link |
Tags
- international-rosetta-mission
- checkout