River channel bank height data for the Rio Beni, Bolivia (NERC grant NE/H009108/1)
Description
Each file contains four columns of data representing: column 1: UTM Zone 19S Easting coordinate for survey location along the Rio Beni, Bolivia. column 2: UTM Zone 19S Northing coordinate for survey location along the Rio Beni, Bolivia. column 3: Measurment range from observer to bank in m column 4: Bank height in m (the difference between bank top and low flow water level) UTM coordinates were measured using a Trimble Global Position System with OmniSTAR HP correction Measurement range and bank height were measured using a GPS supported laser range finder (Impulse 200 LR< Laser Technology inc) Survey 1 was carried out between 15th and 19th September 2011, when the flow discharge within the Beni was in the range 453-530 cumecs Survey 2 was carried out between 20th and 23rd September 2011, when the flow discharge within the Beni was in the range 762-892 cumecs
Resources
| Name |
Format |
Description |
Link |
|
0 |
|
http://www.bgs.ac.uk/services/ngdc/accessions/index.html#item78469 |
Tags
- water-flooding
- nerc_ddc
- river-channels
- ngdc-deposited-data
- flood-plains