Description
Risk Registers for major subsystems completed according to the methodology described in the Risk Management Plan [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf], also included here.
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| Risk Register - Hull.xlsx | XLS | Hull Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf] | Open resource |
| Risk Register - PTO.xlsx | XLS | Power Take-Off (PTO) Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD 07-20-2019.pdf] | Open resource |
| Risk Register - Electric Plant.xlsx | XLS | Electric Plant Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf] | Open resource |
| Risk Register - SCADA.xlsx | XLS | SCADA Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf | Open resource |
| Risk Register - Emergency Systems.xlsx | XLS | Emergency Systems Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf] | Open resource |
| Risk Register - Climate Control.xlsx | XLS | Climate Control Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf] | Open resource |
| Risk Register - Station Power.xlsx | XLS | Station Power Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf] | Open resource |
| Risk Register - Auxiliary Power.xlsx | XLS | Auxiliary Power Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf] | Open resource |
| Risk Register - Aids to Navigation.xlsx | XLS | Aids to Navigation Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf] | Open resource |
| Risk Register - Cooling System.xlsx | XLS | Cooling System Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf] | Open resource |
| Risk Register - Surveillance.xlsx | XLS | Surveillance Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf] | Open resource |
| Risk Register - Designations and Markings.xlsx | XLS | Designations and Markings Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf] | Open resource |
| Risk Register - Hull Fitting.xlsx | XLS | Hull Fitting Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf] | Open resource |
| Risk Register - Hull Penetrations.xlsx | XLS | Hull Penetrations Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf] | Open resource |
| Risk Register - Mooring.xlsx | XLS | Mooring Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf] | Open resource |
| Risk Register - Umbilical.xlsx | XLS | Umbilical Risk Register completed according to the methodology described in [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf] | Open resource |
| Risk Management Plan.pdf | Risk Management Plan | Open resource |
Tags
- columbia-power-technologies
- cost-reduction
- criticality-analysis
- effects
- environment
- failure-modes
- fmeca
- low-power-wave-energy-converter
- low-power-wec
- maintenance
- marine
- mhk
- non-grid-applications
- operation
- power-take-off
- pto
- renewables
- risk
- risk-management
- risk-register
- wave
- wave-energy
- wave-energy-converter
- wec