PAI: Mass transport on conoids — Fully protected conoid area (Cn)

Description

Hydrogeological Asset Plan: Mass transport on conoids — Cn, areas of conoids not recently reactivated or fully protected by defence works (medium or moderate hazards).SCOPO: To ensure the protection of soil against hydrogeological and hydraulic failure and the protection of the environmental aspects related to it, through the planning of structural works, constraints and directives.

Resources

Name Format Description Link

Tags

  • eu

Topics

  • JUST
  • ENVI

Categories