PAI: Mass transport on conoids — Fully protected conoid area (Cn)
Description
Hydrogeological Asset Plan: Mass transport on conoids — Cn, areas of conoids not recently reactivated or fully protected by defence works (medium or moderate hazards).SCOPO: To ensure the protection of soil against hydrogeological and hydraulic failure and the protection of the environmental aspects related to it, through the planning of structural works, constraints and directives.
Resources
| Name |
Format |
Description |
Link |