Description
Installation point of the support of the high voltage lines of the operator TERNA (Company responsible for the development of the national transmission grid — RTN) that have replaced the old lanes.SCOPO:ridurre the overall impact of existing electrical equipment with a remarkable improvement of the landscape.
Resources
| Name | Format | Description | Link |
|---|