PAI: Floods — Very High Hazardous Area (Ee) — All. 4.1

Description

Hydrogeological Asset Plan: Floods and morphological disturbances of a torrential nature along the auctions of the watercourses — Ee, areas involved by phenomena with very high danger.SCOPO: To ensure the protection of soil against hydrogeological and hydraulic failure and the protection of the environmental aspects related to it, through the planning of structural works, constraints and directives.

Resources

Name Format Description Link

Tags

  • eu

Topics

  • JUST
  • ENVI

Categories