Description
Public performance measure (PPM) measures the number of trains reaching their final destination 'on time'. On time is defined as within five minutes for regional and London and South East trains, and within ten minutes for long distance trains.
Source agency: Office of Rail and Road
Designation: National Statistics
Language: English
Alternative title: Train punctuality and reliability
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| Table 3144 - Average passenger lateness by operator and sector (periodic) | ODS | Open resource | |
| Table 3194 - Cancelled and Significantly Late by operator and sector (periodic) | ODS | Open resource | |
| Table 3184 - Delay minutes by operator and cause (periodic) | ODS | Open resource | |
| Table 3167 - Disaggregated train punctuality and reliability performance by sub-operator (periodic) | ODS | Open resource | |
| Table 3128 - Train cancellations by operator (periodic) | ODS | Open resource | |
| Table 3104 - Passenger trains planned by operator (periodic) | ODS | Open resource | |
| Table 3114 - Public Performance Measure by operator and sector (periodic) | ODS | Open resource | |
| Table 3157 - Days of severe disruption by sub-operator | ODS | Open resource | |
| Table 3103 - Passenger trains planned, PPM, and CaSL by operator | ODS | Open resource | |
| Table 3113 - Public Performance Measure by operator and sector | ODS | Open resource | |
| Table 3123 - Train cancellations by operator and cause | ODS | Open resource | |
| Table 3133 - Train punctuality at recorded station stops by operator | ODS | Open resource | |
| Table 3174 - Consistent Region Measure (Passenger) Performance by Region (periodic) | ODS | Open resource | |
| Table 3124 - Train cancellations by operator and cause (periodic) | ODS | Open resource | |
| Table 3138 - Train punctuality at recorded station stops by operator (periodic) | ODS | Open resource |