Description
Project status report as of end of 2011. Key milestones and accomplishments in the year 2011 include:
Proof of feasibility of analog and digital components with their lifetime tested for more than 500 hours at 300 degrees C,
Demonstration of ceramic-based packaging capable of surviving 300 degrees C,
Demonstration of a temperature sensor system,
Completion of the design of a pressure sensor system, and
Demonstration of a prototype of the digital telemetry system.
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| 2011 Summary Research Report.pdf | Summary of research completed in 2011 on pressure sensor and telemetry methods for measurement while drilling in geothermal wells. Includes project status, technical results, and summary as of 2011. | Open resource |