Performance data for enhanced Innovative/Alternative (I/A) septic systems for nitrogen removal installed in a field demonstration in Barnstable, Massachusetts (2021 - 2023)

Description

Performance data for enhanced I/A septic systems designed for nitrogen removal that were installed during a demonstration project in Barnstable, MA. Includes 1) field and laboratory measurements of water quality parameters in influent, effluent, and lysimeters below leach fields (where available) and 2) metered flow to each system. The initial release (Version 1) includes data collected from 2021-12-10 through 2023-05-03. The second release (Version 2) adds data through 2023-12-04. The README file contains additional details, including notes on data limitations and a change log.

Resources

Name Format Description Link
V1 data release.zip ZIP V1%20data%20release.zip Open resource
V2 data release.zip ZIP V2%20data%20release.zip Open resource

Tags

Topics

Categories