Description
Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 1 Oct 2013 to 31 Oct 2013.
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| October 2013 Hourly Data.xlsx | XLS | Averaged hourly data collected from the ElectraTherm's Green Machine, an Organic Rankine Cycle, running on geothermal co-produced fluids at the Florida Canyon Mine, Nevada with air cooled condensing. Data spans sporadically from October 1, 2013 - October 31, 2013 | Open resource |