Description
Transient hydrogen flow in Nm^3/h within the battery limit of the GrInHy2.0 electrolysis plant and on interface to grid. Cycle: Partial load and start/stop from hot-standby operation over approx. 4 hours.
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| Unknown Resource | Unknown | Open resource | |
| Unknown Resource | Unknown | Open resource |