H2020 Platone German Demonstrator - Active Power Exchange at Grid Connection Point (Medium Voltage/Low Voltage)

Description

The given data are measured values of active power , measured at the low voltage busbar of the medium voltage (MV)/low voltage (LW) grid connection point (secondary substation). The data are provided as 15-minutes mean values in kilowatt. Data Description p_tei_mean = arithmetic mean of p_tei measured in 1-minute intervals devided by number of samples available for computing within 15 minutes (p_tei_count) p_tei_min = the minimum value (1-minute mean) measured within the period of p_tei_mean (15-minutes) p_tei_max = the maximum value (1-minute mean) measured within the period of p_tei_mean period (15-minutes) p_tei_count = the number a 1-minute mean values available for each15-minute interval. Field Test Setup The substation includes a transformer feeding a low voltage grid, consisting of 89 households, 450kW of installed PV generation capacity, a large scale battery with 300 kW and 850 kWh.  This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 864300

Resources

Name Format Description Link
0 http://data.europa.eu/88u/dataset/oai-zenodo-org-7565989
0 http://data.europa.eu/88u/dataset/oai-zenodo-org-7565989

Tags

Topics

Categories