CROSSBOW TC_01.01.01 final demonstration results

Description

This data set represents final demonstration results for the Test Case 1.1 from the High Level Use case 1 of the CROSSBOW project. It contains information about values: ERIC [MW], TIC  [MW], TIF [MW], Loop flow [%], Optimal adequacy transaction [MW] and Net adequacy exchange [MW] for 9 areas (AL, BA, BG, GR, ME; MK, HR, RO and RS) and 366 timestamps (of Week 9 and Week 10 of 2021).  All information about RAA methodology and terms used in this data set could be found in document D4.2 CROSSBOW Regional Operation Centre Balancing Cockpit (ROC-BC).

Resources

Name Format Description Link
0 http://data.europa.eu/88u/dataset/oai-zenodo-org-6465218
0 http://data.europa.eu/88u/dataset/oai-zenodo-org-6465218

Tags

  • optimization
  • regional-adequacy-assessment
  • ptdf
  • eric

Topics

Categories