Next Generation RivGen Power System: Risk Register

Description

Risk Register for the RivGen power system, optimized for performance, durability and survivability, in Microsoft Excel format.

Resources

Name Format Description Link
53 Risk Register for Next Generation MHK River Power System, Optimized for Performance, Durability and Survivability - Excel https://mhkdr.openei.org/files/238/D5%20Risk%20Register%2063258_IVC%20DOE_%2002%2021%2017.xlsx

Tags

  • orpc
  • cec
  • assessment
  • risk-register
  • rivgen
  • hydrokinetic
  • risk
  • cross-flow-turbine
  • axial
  • mhk
  • river
  • analysis
  • environmental
  • reliability
  • economic
  • marine
  • axis
  • power
  • igiugig
  • current
  • technology
  • commercial
  • bottom-mounted
  • technical
  • horizontal
  • economics
  • management
  • regulatory
  • energy
  • shallow

Topics

Categories