Plans for integrating Project activities will include pre-assembly and assembly procedures, disassembly procedures, emergency and safety plans, logistics, operation, transportation and personnel/office plans. |
https://mhkdr.openei.org/files/79/DE-EE0006399%20M2.1%20Test%20Site%20Report%20PD%20v1.0%2007-15-2014%20%281%29.pdf |
|
33 |
This document summarizes the Columbia Power Technologies System Performance Assessment (SPA) and Levelized Cost of Energy (LCOE) goals and projections for the latest StingRAY wave energy converter (WEC) design. |
https://mhkdr.openei.org/files/79/DE-EE0006399%20M13.1.1%20LandRAY%20SPA%20and%20LCOE%20Report%20PD%20v14.0%2001-18-2016%20%281%29.pdf |
|
33 |
This document summarizes the Columbia Power Technologies System Performance Assessment (SPA) and Levelized Cost of Energy (LCOE) goals and projections for the latest StingRAY wave energy converter (WEC) design. |
https://mhkdr.openei.org/files/79/DE-EE0006399%20M13.1.1%20LandRAY%20SPA%20Goal%20and%20LCOE%20Report%20PD%20v13.0%2012-01-2015%20%281%29.pdf |
|
33 |
The test plan for use of the 5MW dynamometer to validate the capability of the power takeoff (PTO), electric plant and Supervisor Control and Data Acquisition system to meet the operating requirements. The dynamometer testing also demonstrates the reliability of the novel generator design for use in real seas as part of Columbia Powers wave energy converter (WEC). |
https://mhkdr.openei.org/files/79/DE-EE0006399%20M8.1%20LandRAY%20Test%20Plan%20PD%20v1.0%2007-20-2014%20%281%29.pdf |
|
33 |
This Report informs DOE and all team members of: the generator, mechanical and electromagnetic designs; electric plant design; dynamometer electrical and mechanical interface designs; and test stand and water tank designs (for seal testing). |
https://mhkdr.openei.org/files/79/DE-EE0006399%20M3.1%20LandRAY%20Component%20Report%20PD%20v1.0%2007-23-2014%20%281%29.pdf |