Priority water routes NGP 2009
Description
Waterways defined in the 2009 National Water Management Plan (NGP) as priority lines to be rehabilitated. In these areas, the NGP provides for the production of organism passability (continuance) on all transverse structures and in all residual water sections by the end of 2015. There are separate layers for those routes that are rehabilitated by land (priority waterways rehabilitation regulation) and by the federal government (EUWRR Rehabilitation Bund). Those routes that are not included in either of the two, but in this main layer do not need to be refurbished, since ok.
Resources
| Name |
Format |
Description |
Link |
|
57 |
|
https://e-gov.ooe.gv.at/at.gv.ooe.dorisdaten/DORIS_U/EUWRR_PRIORITAERE_GEWAESSERSTRECKEN.zip |