Description
This PowerPoint presentation describes the ground source heat pump system installed at the District Energy Corporation's thermal plant at the Lancaster County Adult Detention Facility in Lincoln, NE. The detention facility is a 270,000 sq. ft., 750 bed, secured facility.
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| DEC Detention Sustainability Presentation.pptx | Powerpoint | Power Point presentation with general project overview | Open resource |