January 2006 Most Probable 24-Month Study
Description
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor Park, Blue Mesa, Morrow Point, Crystal, Vallecito, Navajo, Powell, Hoover Dam - Lake Mead, Davis Dam - Lake Mohave, and Parker Dam - Lake Havasu. Operations were projected using Reclamation’s 24-Month Study RiverWare model with the Most Probable unregulated inflow projections provided by the National Weather Service’s Colorado Basin River Forecast Center. The Most Probable inflow scenario reflects a median hydrologic condition which statistically would be exceeded 50% of the time. The operations depicted in this report reflects the Annual Operating Plan as approved by the Secretary of the Interior.
Resources
| Name |
Format |
Description |
Link |
|
33 |
"January 2006 Most Probable 24-Month Study" as a PDF file |
https://data.usbr.gov/rise/content-rise-public/rise/catalog-item/binary/JAN06_508.pdf |
|
21 |
Landing page for "January 2006 Most Probable 24-Month Study" |
https://data.usbr.gov/catalog/6331/item/72368 |
Tags
- utah
- future-projections
- surface-water
- 24-month-study
- modeling
- colorado-river
- hoover
- lake-powell
- wyoming
- lake-mead
- water-modeling
- colorado-river-basin
- california
- glen-canyon
- arizona
- hydrology
- new-mexico
- hydropower
- water-management-operations
- nevada