Electric Vehicle Charging Stations - IRVE
Description
In order to establish a national directory of charging infrastructure for electric vehicles (IRVE), open and accessible to all, local authorities carrying out an IRVE installation project must, as and when the stations are put into service, publish on the data.gouv.fr platform the static data relating to the location and technical characteristics of these installations in accordance with the terms set out in the Order of 4 May 2021.
Etalab consolidates all the datasets produced by the various territorial actors on a consolidated dataset. It aims to be as comprehensive as possible and aims to bring together all the French IRVE terminals.
Resources
| Name |
Format |
Description |
Link |
|
0 |
|
https://www.data.gouv.fr/fr/datasets/r/dd28f1d5-bc54-4580-b729-52231567ed21 |
|
0 |
|
https://www.data.gouv.fr/fr/datasets/r/b751f93f-0285-4798-b6d7-d823e80007b9 |
|
0 |
|
https://www.data.gouv.fr/fr/datasets/r/db197bf2-a6c8-4a84-8dc7-44ee24d62a01 |
Tags
- vehicule-electrique
- point-dinteret
- hauts-de-france-region