BeLib' – Charging points for electric vehicles – Real-time availability
Description
Real-time geolocation of charging points [Bélib'] for electric vehicles – Electric Vehicle Recharging Infrastructure (IRVE)
The Paris Council voted to award a service concession to a new operator, Total Marketing France (TMF), for the technical and commercial operation of public charging stations in Paris.
Specifically, the network of old Autolib' terminals will gradually be replaced by new terminals. The end of this deployment is scheduled for January 2022. The Belib' terminals remain in place.
The entire new network of terminals will be called Belib’.
At the end of the deployment, Paris will then be equipped on road with 433 charging stations for electric vehicles (one station is equipped with several charging points).
The new terminals will be accessible via the new operator as they are installed.
The Belib‘network is available in the dataset [Belib’ – Charging points for electric vehicles – static data](https://parisdata.opendatasoft.com/explore/dataset/belib-points-de-recharge-pour-vehicules-electriques-donnees-statiques/map/?disjunctive.nbre_pdc&disjunctive.accessibilite&disjunctive.horaires_sav&disjunctive.postal_code&disjunctive.acces_recharge&disjunctive.type_prise&disjunctive.puiss_max&basemap=jawg.dark&location=12,48.85927,2.33499)
The recharging points [Paris Recharge] are gradually intended to migrate to the [Belib'] network
**Only the recharging points of the** **network [Belib']** are supervised and **provide real-time availability data.**
**Recharge points status – EVSE*:**
**Statuts**
|
**Description**
—|—
Available
|
Available. EVSE* is free to use
Not implemented
|
At the moment, it is not implemented by the operator. The operator will go back “under maintenance” (from the moment it has been declared by a maintenance).
Occupied (in charge)
|
Busy. There is a charging session currently on EVSE*.
In the process of commissioning
|
EVSE* has not yet been commissioned
In maintenance
|
EVSE* in maintenance.
Planned commissioning
|
Commissioning is planned and EVSE* will soon be available. This is the step that follows the status “In process of commissioning”.
Deleted
|
EVSE* has been removed/removed from infrastructure (Belib’ network)
Booked
|
EVSE* is reserved
Unknown
|
Status is unknown – Used when the terminal does not communicate with our server (either because it is off/no network communication etc... and it is not in maintenance mode)
*EVSE (Electric Vehicle Supply Equipment. Is considered as an independently operated and managed part of a Charge Point that can deliver energy to one EV at a time.)
During this transitional period due to the deployment of the new network, another similar dataset coexists [Paris Recharge – Charging points for electric vehicles – static data](https://parisdata.opendatasoft.com/explore/dataset/bornes-de-recharge-pour-vehicules-electriques/information/?disjunctive.n_amenageur&disjunctive.n_operateur&disjunctive.n_enseigne&disjunctive.code_insee&disjunctive.nbre_pdc&disjunctive.puiss_max&disjunctive.type_prise&disjunctive.acces_recharge&disjunctive.accessibilite&disjunctive.observations)
[Information on electric charging in Paris](https://www.paris.fr/pages/vehicules-electriques-2776)
[Page Belib'](https://belib.paris/home)
At the bottom of this notice, the definition of the data scheme.
Resources
| Name |
Format |
Description |
Link |
|
23 |
|
https://www.data.gouv.fr/api/1/datasets/r/e28f5628-e5ac-481a-be9e-914290e9d77a |
|
8 |
|
https://www.data.gouv.fr/api/1/datasets/r/fde557ec-b96e-49a5-9282-31407296282c |
|
57 |
|
https://www.data.gouv.fr/api/1/datasets/r/737301d5-4df8-4ad1-98ea-be0e74749810 |
|
23 |
|
https://www.data.gouv.fr/api/1/datasets/r/7ecb2834-cc5b-47c2-a607-3de2053516a4 |
Tags
- belib
- rechargement
- vehicule-electrique
- stationnement
- irve
- brve
- mobilite-et-espace-public