National register of electricity production and storage facilities of EDF SA Corse Outremer (as of 31/08/2023)

Description

This register shows electricity generation and storage facilities connected directly or indirectly to public electricity networks in metropolitan France and in non-interconnected areas (NIAs).

In particular, it shall contain the following information:

Name of the installation
Department and municipality of the delivery point of the installation
Installation line
Maximum installed active power
Date of commissioning

For "small" installations (< 36 kVA), aggregation is carried out in batches of at least 10 to the common mesh or department.

The information relating to these installations of less than 36 kW is made public after aggregation, as defined in the Order of 7 July 2016.

In compliance with the regulatory obligations of Article 179 of the LTECV, the finest territorial mesh allowed is the IRIS mesh, and the time step is annual.

Resources

Name Format Description Link
register-of-production-and-storage-installations-d-electricite.csv CSV Open resource
10_Glossary GPC_Facilities Register vRTE.docx Unknown Open resource
11_Glossary GPC_Facilities Register vRTE.docx Unknown Open resource
Version2.txt Unknown Open resource
register-of-production-and-storage-installations-d-electricite.json JSON Open resource
12_Glossary GPC_Facilities Register vRTE.docx Unknown Open resource
Version3.txt Unknown Open resource

Tags

Topics

Categories