History of unavailability of EDF SA’s production resources – since 2015

Description

#### Summary: Last update date: 03/05/2023 Information on the history of unavailability of EDF SA’s production assets and other relevant information on the capacity and use of these assets. ####Detailed description: Regulation 1227/2011 on the integrity and transparency of the wholesale energy market (referred to as REMIT) requires producers to publicly disclose certain information concerning their assets. On the page [“List of unavailability and messages”](https://www.edf.fr/groupe-edf/ambition-neutralite-co2-pour-edf-a-l-horizon-2050/optimisation-et-trading/listes-des-indisponibilites-et-des-messages/liste-des-indisponibilites), you will find a selection of information on the planned and unplanned unavailability of EDF’s production assets as well as other relevant information on the capacity and use of these assets. It is from this page that you will have the most up-to-date data. In case of superposition of unavailability, incidental or programmed, the practice is to retain the minimum available power of unavailability during each overlap period. The data presented on our site are retrieved from the source: https://doaat.edf.fr/doaat/export/full/csv?t=1677144478

Resources

Name Format Description Link
8 https://www.data.gouv.fr/api/1/datasets/r/fea96c0d-1843-4864-8e01-6884755eadd3
23 https://www.data.gouv.fr/api/1/datasets/r/0d95aa61-ef98-4739-b7f8-f21863f9a777

Tags

  • production
  • indisponibilites
  • mix-de-production
  • historique

Topics

Categories