Electricity generation by sector and hourly production costs of EDF SA Corse Outremer

Description

On a monthly basis, information on electricity generation by channel is compiled from metering data, telemetry data and estimates. The information on the recorded cost of production refers to an average of all means of production (all sectors combined). This information is different from the hourly marginal cost of the system, which would correspond first to the variable cost of the most expensive _medium _dispatchable_ started_. These costs are therefore not comparable in particular to the forward-looking marginal costs published by the CRE. The time zone of the data is that of metropolitan France (UTC+ 1 in winter/UTC+ 2 in summer).

Resources

Name Format Description Link
8 https://www.data.gouv.fr/api/1/datasets/r/303e1162-f7b0-43e7-bb8d-974a33bebc03
33 https://www.data.gouv.fr/api/1/datasets/r/fe742f77-cf5a-4625-b8f7-96e6b10b0853
23 https://www.data.gouv.fr/api/1/datasets/r/3124c33a-37a9-4271-b876-aea63a7f7afb

Tags

  • production
  • courbe-de-charge
  • mix-de-production
  • filiere
  • couts

Topics

Categories