Annual Departmental Lengths of Circuits and Lines of Pylons of the Electricity Transmission System (2014 to 2023)

Description

Final annual departmental history at 31 December of the lengths (km) of circuits and lines of aerial and underground towers in operation of the electricity transmission network, by voltage level (63 kV, 90 kV, 225 kV, 400 kV,...). * * * *

Resources

Name Format Description Link
61 https://www.data.gouv.fr/api/1/datasets/r/95552cbd-4290-4386-920e-2181df33ed0c
23 https://www.data.gouv.fr/api/1/datasets/r/04c3ee67-d9da-4c0d-99f9-726e92f349e7
23 https://www.data.gouv.fr/api/1/datasets/r/fba29901-7b7b-4018-8676-084b8a498660
15 https://www.data.gouv.fr/api/1/datasets/r/8dac18cf-06c9-4c88-940a-405fcddbdbfe
23 https://www.data.gouv.fr/api/1/datasets/r/b099b1ca-40fe-4f0c-954d-20459f33a2a4
57 https://www.data.gouv.fr/api/1/datasets/r/3dae777c-41e6-411c-84c3-19b26cf3c298
8 https://www.data.gouv.fr/api/1/datasets/r/7c9b6e1e-1c00-4c1a-9ba2-6deb42ac856f

Tags

  • territoires-et-regions
  • tableau-de-bord-regional
  • bilan-annuel
  • infrastructures

Topics

Categories