Annual regional changes in electricity transmission network circuit lengths (2013 to 2023)

Description

Annual regional evolution of the lengths (km) of circuits in operation of the electricity transmission network by voltage level (63 kV, 90 kV, 225 kV, 400 kV, ...) and by nature of evolution (new infrastructure, renewal, undergrounding, scrap, other modifications). Definitive data.

The types of development of a section are:

  • New: when the installation of the section is re-routed (e.g. a new link)
  • Renewed: when an air section is replaced by an air section or when an underground section is replaced by an underground section
  • Underground: when an air section is replaced by an underground section
  • Scrap: when the section has been physically removed from the network
  • Other changes: these are all variations in length not recorded in new and scrapped sections. This mainly concerns sections placed in reserve (disconnected from the network but still in place) but also error or length corrections

Resources

Name Format Description Link
Export in Shapefile format ESRI Shape Open resource
evolutions-lengths-regionales-annuals-circuits-rte.zip ZIP Open resource
evolutions-lengths-regionales-yearly-circuits-rte.json JSON Open resource
Export in GeoJSON format GeoJSON Open resource
evolutions-lengths-regionales-annuals-circuits-rte.csv CSV Open resource
evolutions-lengths-regionales-annuals-circuits-rte.geojson JSON Open resource
Export in JSON format JSON Open resource

Tags

Topics

Categories