HERO WEC V1.0 - Electrical PTO Deployment Data and Analysis

Description

This submission includes the processed and raw field electrical data from NREL's August 2022 HERO WEC (hydraulic and electric reverse osmosis wave energy converter) deployment at Jennette's Pier for the electrical PTO (power take-off).

Resources

Name Format Description Link
8 Spotter buoy data wave resource at deployment site. https://spotters.sofarocean.com/?user-filter=1606 https://mhkdr.openei.org/files/487/WaveData_CSIJennettes_Sofar.csv
0 MATLAB script to process deployment data. https://mhkdr.openei.org/files/487/AugDeploymentData.m
57 Raw data files for electrical measurements including: AC generator output voltage and current, DC charge controller output voltage and current, and flow rate and pressure from pump to reverse osmosis unit. https://mhkdr.openei.org/files/487/deployment%20data.zip
21 Home page on OpenEI.org for HERO-WEC project https://openei.org/wiki/HERO-WEC

Tags

  • processed-data
  • hydrokinetic
  • reverse-osmosis
  • hydraulic-pto
  • mhk
  • point-absorber
  • wec
  • marine
  • outer-banks
  • power
  • north-carolina
  • sim-model
  • raw-data
  • energy

Topics

Categories