Ground control point locations for UAS survey of the intertidal zone at Post Point, Bellingham Bay, WA, 2019-06-06

Description

This portion of the data release presents the locations of the temporary ground control points (GCPs) used for the structure-from-motion (SfM) processing of the imagery collected during an unmanned aerial system (UAS) survey of the intertidal zone at Post Point, Bellingham Bay, WA on 2019-06-06. Nineteen temporary ground control points (GCPs) were distributed throughout each survey area to establish survey control. The GCPs consisted of a combination of small square tarps with black-and-white cross patterns and "X" marks placed on the ground using temporary chalk. The GCP positions were measured using post-processed kinematic (PPK) GPS, using corrections from a GPS base station located approximately 5 kilometers from the study area. The GCP positions are presented in a comma-delimited text file.

Resources

Name Format Description Link
Original Metadata XML The metadata original format Open resource
Digital Data XML Landing page for access to the data Open resource

Tags

Topics

Categories