Exploration of the Southern Ring Road Groningen
Description
From 1992 to 1998, the route/m.e.r. study Zuidelijke Ringweg Groningen (ZRG) was carried out. Prior to the Tracébesluit rijksweg 7 Zuidelijke Ringweg Groningen (MIT phase 1 ZRG) in 2002, the Minister expressed her preference for a new route in accordance with variant C3 (Zuidtangent), if the evaluation of the phase 1 measures gives cause for this and sufficient financial resources would be available.
Resources
| Name |
Format |
Description |
Link |
|
33 |
|
https://data.groningen.nl/sites/default/files/open-data/verk-alt-zuid-ringw-fase2.pdf |
|
33 |
|
https://data.groningen.nl/sites/default/files/open-data/verk-alt-zuidelijke-ringw.pdf |
Tags
- mobiliteit
- zuidtangent
- autoverkeer
- zuidelijke-ringweg