Description
In this study, we have undertaken a robust analysis of the global supply chain and manufacturing costs for components of Organic Rankine Cycle (ORC) Turboexpander and steam turbines used in geothermal power plants. We collected a range of market data influencing manufacturing from various data sources and determined the main international manufacturers in the industry. The data includes the manufacturing cost model to identify requirements for equipment, facilities, raw materials, and labor. We analyzed three different cases;
1) 1 MW geothermal ORC Turboexpander
2) 5 MW ORC Turboexpander
3) 20 MW geothermal Steam Turbine
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| Global Value Chain and Manufacturing Analysis of Geothermal Turbines Technical Report.pdf | CEMAC Technical Report | Open resource | |
| Cost Model for 1MW Turboexpander .xlsm | XLS | DCF analysis and manufacturing cost model for 5 MW Turboexpander | Open resource |
| Cost Model for 20MW Steam Turbine.xlsm | XLS | DCF analysis and manufacturing cost model for 20 MW Geothermal Steam Turbine | Open resource |
| Cost Model for 5MW Turboexpander.xlsm | XLS | DCF analysis and manufacturing cost model for 1 MW Turboexpander | Open resource |
| Turbine Off-Design Performance Model.xlsm | XLS | IPSEpro software off-design turbine performance analysis results | Open resource |
| SAM DCF Results.xlsx | XLS | Discounted cash flow (DCF) analysis results by using Systems Adviser Model (SAM) | Open resource |