Global Value Chain and Manufacturing Analysis on Geothermal Power Plant Turbines

Description

In this study, we have undertaken a robust analysis of the global supply chain and manufacturing costs for components of Organic Rankine Cycle (ORC) Turboexpander and steam turbines used in geothermal power plants. We collected a range of market data influencing manufacturing from various data sources and determined the main international manufacturers in the industry. The data includes the manufacturing cost model to identify requirements for equipment, facilities, raw materials, and labor. We analyzed three different cases; 1) 1 MW geothermal ORC Turboexpander 2) 5 MW ORC Turboexpander 3) 20 MW geothermal Steam Turbine

Resources

Name Format Description Link
53 DCF analysis and manufacturing cost model for 5 MW Turboexpander https://gdr.openei.org/files/1067/DCF%20results_1MW%20Turboexpander%20model.xlsm
53 Discounted cash flow (DCF) analysis results by using Systems Adviser Model (SAM) https://gdr.openei.org/files/1067/SAM%20DCF%20Results.xlsx
53 DCF analysis and manufacturing cost model for 1 MW Turboexpander https://gdr.openei.org/files/1067/DCF%20results_5MW%20Turboexpander%20model.xlsm
53 IPSEpro software off-design turbine performance analysis results https://gdr.openei.org/files/1067/IPSEpro%20Offdesign%20Performance%20Model%20Results.xlsm
53 DCF analysis and manufacturing cost model for 20 MW Geothermal Steam Turbine https://gdr.openei.org/files/1067/DCF%20results_%2020MW%20Steam%20Turbine%20model.xlsm
33 CEMAC Technical Report https://gdr.openei.org/files/1067/CEMAC%20GTO_Technical%20Report_Geothermal%20Power%20Plant%20Turbines_Final_06.01.2018.pdf

Tags

  • power-plant
  • orc
  • manufacturing
  • value-chain
  • clean-energy-manufacturing-analysis-center
  • steam-turbine
  • turboexpander
  • geothermal
  • energy

Topics

Categories