Geothermal Technologies Program GETEM and LCOE Improvements Review (March 21, 2013)
Description
This file was a report submitted to GTO by Mark Paster, a consultant to the GETEM project, to outline the improvements that were made between summer 2011 and spring 2013. The report focuses on six areas of model improvement:
(1) Site Specific Cost Variability;
(2) Consistency with other EERE Programs' LCOE Approach and Methodology;
(3) Risk Assessment/Cost;
(4) Specific Data Gaps, Well Drilling Costs, Power Plant Costs;
(5) Future LCOE Projections; and
(6) Vetting by Industry.
Resources
| Name |
Format |
Description |
Link |
|
33 |
Report on GETEM model improvements between summer 2011 and spring 2013 |
https://gdr.openei.org/files/224/LCOE%20Improvements%20Report%20MP.pdf |
Tags
- getem
- geothermal-electricity-technology-evaluation-model
- lcoe
- levelized-cost-of-electricity
- geothermal