Gearbox Reliability Collaborative Phase 3 Gearbox 3 Test

Description

The GRC uses a combined gearbox testing, modeling, and analysis approach disseminating data and results to the industry and facilitating improvement of gearbox reliability. This test data describes the tests of GRC gearbox 3 in the National Wind Technology Center dynamometer and documents any modifications to the original test plan. It serves as a guide to interpret the publicly released data sets with brief analyses to illustrate the data. TDMS viewer and Solidworks software required to view data files.

The National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) was established by the U.S. Department of Energy in 2006; its key goal is to understand the root causes of premature gearbox failures and improve their reliability.

Resources

Name Format Description Link
PDF Format. Engineering drawings of GRC gearbox (GB) 3 showing basic part dimensions, characteristics and assembly procedures. Binary PDF Format. Engineering drawings of GRC gearbox (GB) 3 showing basic part dimensions, characteristics and assembly procedures. Open resource
Solidworks Format. Solid body models of GRC gearbox (GB) 3 for visualization and other analyses. Binary Solidworks Format. Solid body models of GRC gearbox (GB) 3 for visualization and other analyses. Open resource
TDMS Files. The drivetrain commissioning test sequence ensured that the dynamometer controls, drivetrain, gearbox, lubrication and cooling systems and instrumentation were all operating normally and ready for full-load testing. Binary TDMS Files. The drivetrain commissioning test sequence ensured that the dynamometer controls, drivetrain, gearbox, lubrication and cooling systems and instrumentation were all operating normally and ready for full-load testing. Open resource
TDMS Files. Static bending moment tests for GB3 were conducted in offline conditions at 5.5% power. Unknown TDMS Files. Static bending moment tests for GB3 were conducted in offline conditions at 5.5% power. Open resource
Log of Static Bending Moment Tests Binary Log of Static Bending Moment Tests Open resource
TDMS Files. Static bending moment tests for GB3 were conducted in offline conditions at 5.5% reverse power. Unknown TDMS Files. Static bending moment tests for GB3 were conducted in offline conditions at 5.5% reverse power. Open resource
TDMS Files. Static bending moment tests for GB3 were conducted in offline conditions at 0% power. Unknown TDMS Files. Static bending moment tests for GB3 were conducted in offline conditions at 0% power. Open resource
TDMS Files. Static bending moment tests for GB3 were conducted at 25% power. Unknown TDMS Files. Static bending moment tests for GB3 were conducted at 25% power. Open resource
TDMS Files. Static bending moment tests for GB3 were conducted at 50% power. Unknown TDMS Files. Static bending moment tests for GB3 were conducted at 50% power. Open resource
TDMS Files. Static bending moment tests for GB3 were conducted at 75% power. Unknown TDMS Files. Static bending moment tests for GB3 were conducted at 75% power. Open resource
TDMS Files. Static bending moment tests for GB3 were conducted at 100% power. Unknown TDMS Files. Static bending moment tests for GB3 were conducted at 100% power. Open resource
TDMS Files. Static bending moment tests for GB3 were conducted at 10% power. Unknown TDMS Files. Static bending moment tests for GB3 were conducted at 10% power. Open resource
TDMS Files. Dynamic bending moment tests for GB3 will be completed in offline (sequence 1), 25%-power (sequence 2), and 100%-power (sequence 3) conditions. Unknown TDMS Files. Dynamic bending moment tests for GB3 will be completed in offline (sequence 1), 25%-power (sequence 2), and 100%-power (sequence 3) conditions. Open resource
TDMS Files. Static thrust testing test sequences were completed in offline mode (sequence 2), at 25%-power (sequence 3), 50%-power (sequence 4), 75%-power (sequence 5), and 100%-power (sequence 6) conditions. Binary TDMS Files. Static thrust testing test sequences were completed in offline mode (sequence 2), at 25%-power (sequence 3), 50%-power (sequence 4), 75%-power (sequence 5), and 100%-power (sequence 6) conditions. Open resource
TDMS Files. In Phase 3 testing of GB2, the generator was misaligned up to 3° to assess whether excessive loads were imparted onto the HSS bearings. NOTE: this archive is no longer functional. We apologize for the inconvenience. Binary TDMS Files. In Phase 3 testing of GB2, the generator was misaligned up to 3° to assess whether excessive loads were imparted onto the HSS bearings. NOTE: this archive is no longer functional. We apologize for the inconvenience. Open resource
TDMS Files. Reproduction of field conditions in the dynamometer was achieved in Phase 3 testing of GB2 using the dynamometer variable frequency drive capability. The same normal power production and shutdown cases tests will be repeated for GB3. NOTE: this archive is no longer functional. We apologize for the inconvenience. Binary TDMS Files. Reproduction of field conditions in the dynamometer was achieved in Phase 3 testing of GB2 using the dynamometer variable frequency drive capability. The same normal power production and shutdown cases tests will be repeated for GB3. NOTE: this archive is no longer functional. We apologize for the inconvenience. Open resource
TDMS Files. Controlled shutdowns tests were also completed on November 3, 2016. While operating at a steady-state power level, the dynamometer was intentionally shut down in a controlled fashion. NOTE: this archive is no longer functional. We apologize for the inconvenience. Binary TDMS Files. Controlled shutdowns tests were also completed on November 3, 2016. While operating at a steady-state power level, the dynamometer was intentionally shut down in a controlled fashion. NOTE: this archive is no longer functional. We apologize for the inconvenience. Open resource
This test report describes the recent tests of GRC gearbox (GB) 3 in the National Wind Technology Center (NWTC) dynamometer and documents any modifications to the original test plan. PDF This test report describes the recent tests of GRC gearbox (GB) 3 in the National Wind Technology Center (NWTC) dynamometer and documents any modifications to the original test plan. Open resource