Description
This dataset contains the perimeter of the RIP in the Arone watershed approved on 28/06/2007. This is the scope of risk exposure that corresponds to the scope regulated by the approved RPP. This approved perimeter is a utility easement (PM1 for PPRNs).
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| download | Unknown | Open resource |