Simple download service (Atom) of the dataset: Water Pollution Risk Regulated Areas of the May-sur-Orne Basin Mine Risk Prevention Plan

Description

The objective of the regulatory zoning phase of a PPRM is to delineate homogeneous areas in terms of prohibitions, prescriptions, recommendations or land use, both for new projects and for existing assets. The principles of this zoning are based in particular on a confrontation between the different levels of hazards previously identified and the assessment of existing and future issues characterising the surface. The identification of these homogeneous areas results in the development of a mapping of the regulatory zoning of the PPRM. Directly related to this zoning, a regulation must be established. Its purpose is to set out, in a clear and operational manner, the regulatory measures that apply to each of the Regulatory Areas. The May-sur-Orne Mine Risk Prevention Plan was approved on 10/08/2021.

Resources

Name Format Description Link
0 http://atom.geo-ide.developpement-durable.gouv.fr/atomMetadata/GetResourceDescription?id=175953dc-5bdf-41d1-ac95-d7814912792f

Tags

Topics

Categories