Dataset Direct Download Service (WFS): PPRN — RPP Perimeter Flooding — Moselle Average — SEXEY-AUX-FORGES (54505)

Description

This scope of risk exposure corresponds to the scope regulated by the approved RPP. It is public utility easement PM1 for PPRNs.

Resources

Name Format Description Link
0 http://ogc.geo-ide.developpement-durable.gouv.fr/wxs?map=/opt/data/carto/geoide-catalogue/1.4/org_38050/07002505-4f38-483a-83bb-d2f8fcb693e6.internet.map

Tags

  • wfs-1.1.0

Topics

Categories