Flooding areas of the stump, occurrence 10 years, for Côte-d’Or
Description
This layer corresponds to the flood zone calculated by hydraulic modelling for an occurrence flood 10 years. The modelling of the different floods was carried out with a view to assisting flood crisis management. These modelling also led to the realisation of PPRNs.
Resources
| Name |
Format |
Description |
Link |