Garonne Basin: Anguille Management Plan — Garonne-Dordogne-Charente-Seudre-Leyre Priority Action Zone (ZAP)
Description
This dataset contains the localisation of the works of the Garonne-Dordogne-Charente-Seudre-Leyre Priority Action Zone (ZAP) and identified as priorities in The Angle Management Plan (PGA).
The Angle Management Plan (AMP) has defined a priority area in which the works will have to be processed by 2015 to become franchiseable both at run-off and downhill, in accordance with the regulations in force.
The delimitation of this area is the result of an analysis reflecting the best cost-effectiveness of possible management vis-à-vis the eel.
In the various basins 1555 priority works have been identified.
The Angle Management Plan includes several local components per Angle Management Unit (UGA).
Aquitaine is concerned by 2 territories:
— local Adour component: the Adour basin and the coastal rivers of the Landes and Basques.
— local component Garonne: watersheds of Garonne, Dordogne, Charente, Seudre and Leyre rivers.
Resources
| Name |
Format |
Description |
Link |
Tags
- données-ouvertes
- poissons-migrateurs
- zap
- ouvrages-prioritaires
- zones-d'actions-prioritaires