Description
The Most Probable 24-Month Study report describes projected operations and power generation for Colorado River system reservoirs including Fontenelle, Flaming Gorge, Taylor Park, Blue Mesa, Morrow Point, Crystal, Vallecito, Navajo, Powell, Hoover Dam - Lake Mead, Davis Dam - Lake Mohave, and Parker Dam - Lake Havasu. Operations were projected using Reclamation’s 24-Month Study RiverWare model with the Most Probable unregulated inflow projections provided by the National Weather Service’s Colorado Basin River Forecast Center. The Most Probable inflow scenario reflects a median hydrologic condition which statistically would be exceeded 50% of the time. The operations depicted in this report reflects the Annual Operating Plan as approved by the Secretary of the Interior.
Resources
| Name | Format | Description | Link |
|---|---|---|---|
| RISE Item Details Page URL for "February 2020 Most Probable 24-Month Study" | HTML | Landing page for "February 2020 Most Probable 24-Month Study" | Open resource |
| PDF File for "February 2020 Most Probable 24-Month Study" | "February 2020 Most Probable 24-Month Study" as a PDF file | Open resource |