February 2014 Dixie Valley Binary Cycle Cost Data

Description

Dixie Valley Binary Plant Monthly Costs from February, 2014. Includes cost and man-hour data demonstrating the technical and economic feasibility of utilizing the available unused heat to generate additional electric power from a binary power plant from the low-temperature brine at the plant.

Resources

Name Format Description Link
53 Bottoming cycle unit monthly costs data for February 2014 https://gdr.openei.org/files/348/Dixie%20Binary%20costs%20February%202014.xls

Tags

  • supercritical-cycle
  • brine
  • cost-data
  • bottoming
  • dixie-valley
  • binary-power-plant
  • costs
  • binary-cycle
  • low-temperature
  • binary-plant
  • geothermal

Topics